T8 - 2021
Weekly intensity during 2022
Showing the intensity delivered each week to T8. Dark grey bar shows amount ejected from PS (measured by PR.BCT), light grey shows amount reaching T8 (measured by T8.XSEC070). Also showing IRRAD target of 2.2e16 protons per week and mean weekly intensity. Edge colour of bars shows whether that week passed facility specs.
Cumulative Plot
Showing the intensity delivered each week to T8. Dark grey bar shows amount ejected from PS (measured by PR.BCT), light grey shows amount reaching T8 (measured by T8.XSEC070). Also showing IRRAD target of 2.2e16 protons per week and 2018 everage performance of 1.6E16 protons per week. Edge colour of bars shows whether that week passed facility specs.
Integrated intensity by week
Proton intensity delivered during a given week in 2022 run. Change week using the tabs. N.B: Weeks are defined from 9am Wednesday - 9am Wednesday as per the convention used by IRRAD. Also showing IRRAD target of 2.2e16 protons per week
Protons per second by week
Protons per second delivered to T8 on EAST3 for each week during 2022 run. NB: Weeks are defined from 9am Wednesday - 9am Wednesday as per the convention used by IRRAD. Data from Wednesdays has been removed as IRRAD is frequently in access on Wednesday, making it difficult to establish duty cycle for these days.
Beam integrated intensity
Showing the integrated intensity sent to the different East destinations (T8, T9, N). Data comes from the accumulated sum of F61.BCT01:TOTAL_INTENSITY.
Beam Intensity
Showing beam intensity after injection (PR.DCAFTINJ_1) and before extraction (PR.DCBEFEJE_2) for beams having an East destination (EAST_T8, EAST_T9 and EAST_N).
Beam Normalized losses
Showing data from different BLMs (lossBeamPresence) divided by the intensity before extraction.