T9 - 2023

Beam integrated intensity

Showing the integrated intensity sent to the different East destinations (T8, T9, N). Data comes from the accumulated sum of F61.BCT01:TOTAL_INTENSITY.

Showing beam intensity after injection (PR.DCAFTINJ_1) and before extraction (PR.DCBEFEJE_2) for beams having EAST_T9 as destination.

Beam MRP at C900

Showing the MRP position at C900 for beams with East destination (T8, T9, N).

Data comes from the UCAP device 'PS-UCAP-East-mrpC900'.