T8 - 2023

Protons per second per Supercycle

Showing the intensity per second for each supercycle where beam was sent to T8 on EAST3 user

Weekly intensity during 2023

Showing the intensity delivered each week to T8. Dark grey bar shows amount ejected from PS (measured by PR.BCT), light grey shows amount reaching T8 (measured by T8.XSEC070). Also showing IRRAD target of 2.2e16 protons per week and mean weekly intensity. Edge colour of bars shows whether that week passed facility specs. Weeks may be excluded if they are part of the comissioning at the start of the run or if other factors made this week atypical

Cumulative Plot

Showing the cumulative intensity delivered to T8 week by week. Dark grey bar shows amount ejected from PS (measured by PR.BCT), light grey shows amount reaching T8 (measured by T8.XSEC070). Also showing IRRAD target of 2.2e16 protons per week and 2018 everage performance of 1.6E16 protons per week. Edge colour of bars shows whether that week passed facility specs. Weeks may be excluded if they are part of the comissioning at the start of the run or if other factors made this week atypical

Integrated intensity by week

Proton intensity delivered during a given week in 2023 run. Change week using the tabs. N.B: Weeks are defined from 9am Wednesday - 9am Wednesday as per the convention used by IRRAD. Statistics use nominla IRRAD target of 2.2E16 protons per week and nominla flux of 5E10 protons/second

Protons per second by week

Protons per second delivered to T8 on EAST3 for each week during 2023 run. NB: Weeks are defined from 9am Wednesday - 9am Wednesday as per the convention used by IRRAD. Data from Wednesdays has been removed as IRRAD is frequently in access on Wednesday, making it difficult to establish duty cycle for these days.

Beam integrated intensity

Showing the integrated intensity sent to T8 (pulse by pulse)Data comes from the accumulated sum of F61.BCT01:TOTAL_INTENSITY.

Beam intensity

Showing beam intensity after injection (PR.DCAFTINJ_1) and before extraction (PR.DCBEFEJE_2) for beams having an East destination (EAST_T8, EAST_T9 and EAST_N).